← Back to VOLUME 14, ISSUE 10, OCTOBER 2026
This work is licensed under a Creative Commons Attribution 4.0 International License.
Predictive Maintenance of an Industrial Flow Control Loop
S. V. Kulkarni, Saurabh Survase, Bhairavnath Borate, Ajinkya Modak
π 17 viewsπ₯ 2 downloads
Abstract: Process industries frequently employ industrial flow-control systems to maintain operational conditions and control fluid flow. The interplay of control valves, actuators, process instruments, and control equipment affects their performance. It is possible to create a benchmark for evaluating a system's performance over time by examining how it reacts to control commands.
The Forbes Marshall laboratory facility's flow-control loop is examined in this paper. Subject to controller compatibility, CODESYS is meant to serve as the programming environment for the Microcon ER 201 series programmable logic controller (PLC) used in the setup. Time-stamped command and flow measurements are used to evaluate the delay before a flow response is observed and the time taken for the measured flow to enter a specified target range. Comparing these parameters under similar operating conditions can help describe the consistency of the system's response. The paper lays the groundwork for future research on industrial monitoring of conditions and predictive maintenance and offers a useful technique for assessing command-to-flow behaviour. Keywords: Industrial Flow Control, Programmable Logic Controller, CODESYS, Control Valve, Electromagnetic Flow Meter, Response-Time Analysis, Condition Monitoring, Predictive Maintenance.
The Forbes Marshall laboratory facility's flow-control loop is examined in this paper. Subject to controller compatibility, CODESYS is meant to serve as the programming environment for the Microcon ER 201 series programmable logic controller (PLC) used in the setup. Time-stamped command and flow measurements are used to evaluate the delay before a flow response is observed and the time taken for the measured flow to enter a specified target range. Comparing these parameters under similar operating conditions can help describe the consistency of the system's response. The paper lays the groundwork for future research on industrial monitoring of conditions and predictive maintenance and offers a useful technique for assessing command-to-flow behaviour. Keywords: Industrial Flow Control, Programmable Logic Controller, CODESYS, Control Valve, Electromagnetic Flow Meter, Response-Time Analysis, Condition Monitoring, Predictive Maintenance.
How to Cite:
[1] S. V. Kulkarni, Saurabh Survase, Bhairavnath Borate, Ajinkya Modak, βPredictive Maintenance of an Industrial Flow Control Loop,β International Journal of Innovative Research in Electrical, Electronics, Instrumentation and Control Engineering (IJIREEICE), DOI: 10.17148/IJIREEICE.2026.141027
